Job Type: Utilities

Booster and Pipe Construction

· pyxl

Projects AZ Booster Pumping Station Home Projects AZ Booster Pumping Station Mining and Industrial Pima County, AZ Stainless Steel Piping Meridian self-performed 100% of the project, including fabrication and installation of the stainless steel structure and piping systems, with no subcontracted work. The project was completed with an emphasis on safety and environmental sensitivity while…

AZ Mining Booster Station

· pyxl

Projects Third Stage Booster Station and Pipeline Construction Home Projects Third Stage Booster Station and Pipeline Construction Mining and Industrial Green Valley, Pima County, AZ HDPE Pipe Fusing • Mine Pipeline / Large-Diameter HDPE Meridian self-performed approximately 80% of the project, including excavation, clearing and grubbing, compacted backfill, gravel roadways, riprap, dewatering, stormwater control, and…

WTP Mechanical, Electrical & Instrumentation Installation

· pyxl

Projects WTP Mechanical, Electrical & Instrumentation Installation Home Projects WTP Mechanical, Electrical & Instrumentation Installation Mining and Industrial Patagonia, Arizona Water Treatment Plant Installation / Mine Infrastructure The project installed a mine-site water treatment plant, including FRP/HDPE tanks, a lime silo, multi-flow unit, filter press, pumps, steel platforms, stairs, and handrails. Work included process piping,…

Russell Gulch Landfill Stage 3A Expansion

· pyxl

Projects Russell Gulch Landfill Stage 3A Expansion Home Projects Russell Gulch Landfill Stage 3A Expansion Water / Wastewater Gila County, Arizona Landfill Expansion / Environmental Civil Construction The project expanded the Stage 3A landfill cell and surface impoundment across approximately 6.1 acres, including mass earthwork, subgrade preparation, leachate collection piping, dewatering, and a geosynthetic liner…

Beaver Creek Diversion Restoration – CMAR

· pyxl

Projects Beaver Creek Diversion Restoration – CMAR Home Projects Beaver Creek Diversion Restoration – CMAR Water / Wastewater Ridgway, Colorado CMAR / High-Altitude Stream Restoration The project delivers boulder grade-control structures, a Coanda screen, infiltration gallery, 18- to 20-inch underground pipe, flume, stream restoration, and dewatering above 9,000 feet, using an accelerated design-and-build CMAR process.…

Los Alamos Wastewater Treatment Plant Belt Press Replacement

· pyxl

Projects Los Alamos Wastewater Treatment Plant Belt Press Replacement Home Projects Los Alamos Wastewater Treatment Plant Belt Press Replacement Water / Wastewater Los Alamos County, New Mexico Wastewater Treatment Plant Upgrade / Dewatering System Replacement The project replaces the existing belt press at the plant with a new dewatering system while maintaining full plant operations…

Florence Canal Reach II Rehabilitation

· pyxl

Projects Florence Canal Reach II Rehabilitation Home Projects Florence Canal Reach II Rehabilitation Water / Wastewater Pinal County, Arizona Canal Rehabilitation / Irrigation Infrastructure The project rehabilitated approximately 11.5 miles of canal for the San Carlos Irrigation and Drainage District, including structures, concrete pipe, and related appurtenances, with 98% of the work self-performed. Project Details…

Reach 22A Navajo-Gallup Water Supply Project / Cutter Dam

· pyxl

Projects Reach 22A Navajo-Gallup Water Supply Project / Cutter Dam Home Projects Reach 22A Navajo-Gallup Water Supply Project / Cutter Dam Federal Civil San Juan County, New Mexico Dam / Raw-Water Conveyance / Dewatering Meridian connected Cutter Dam to a future pumping plant through 4.5 miles of pressure pipeline for the Bureau of Reclamation, including…

Replacement of American Canal Lining

· pyxl

Projects Replacement of American Canal Lining Home Projects Replacement of American Canal Lining Federal Civil El Paso County, Texas Canal Rehabilitation / Environmental Remediation Meridian reconstructed 2,600 LF of the American Canal for the IBWC, placing approximately 5,800 CY of structural concrete and 1.03 million pounds of reinforcing steel while removing 17,000 CY of contaminated…

Alamo Highway Road Project – Navajo Nation

· pyxl

Projects Alamo Highway Road Project – Navajo Nation Home Projects Alamo Highway Road Project – Navajo Nation Federal Civil Cibola County, New Mexico Rock Blasting • Remote Roadway Construction Meridian installed a new PLS pipeline around the Lampbright stockpile, combining approximately 10,000 LF of 30-inch HDPE with roughly 2,000 LF of 24- and 28-inch stainless…