Russell Gulch Landfill Stage 3A Expansion
- Water / Wastewater
- Gila County, Arizona
Landfill Expansion / Environmental Civil Construction
The project expanded the Stage 3A landfill cell and surface impoundment across approximately 6.1 acres, including mass earthwork, subgrade preparation, leachate collection piping, dewatering, and a geosynthetic liner system.
Project Details
- Owner Type
- Municipal / County
- Primary Scope
- Drainage / Flood Control · Earthwork / Grading · Landfill / Environmental Civil · Utilities
About the Project
Meridian constructed the Stage 3A expansion at Russell Gulch Landfill, combining major earthwork with a new geosynthetic liner system, leachate collection infrastructure, and a surface impoundment. The landfill cell and surrounding cut areas covered approximately 5.1 acres, with another 1.0 acre dedicated to the surface impoundment and surrounding cuts.
Meridian self-performed excavation, subgrade preparation, leachate piping, demolition, and dewatering. The project also required adapting to an owner-directed cell redesign and a change in the leachate-sump location.
More Work
Related Projects
-
Mining and Industrial
Mine Facility Expansion
-
Pima County, AZ · Mining and Industrial
Booster and Pipe Construction
-
Green Valley, Pima County, AZ · Mining and Industrial
AZ Mining Booster Station
-
Patagonia, Arizona · Fabrication
WTP Mechanical, Electrical & Instrumentation Installation
-
Tohono O’odham Nation, Arizona · Federal Civil
High-Water Crossing at Vamori Wash
-
Bernalillo County, New Mexico · DOT / Transportation
Tramway Boulevard (NM 556) Bridge Rehabilitation
1 – 3 of 6