Ridgway 03 AI ENHANCED UNDER 800KB
Projects

Beaver Creek Diversion Restoration – CMAR

  • Alternative Delivery
  • Ridgway, Colorado

CMAR / High-Altitude Stream Restoration

The project delivers boulder grade-control structures, a Coanda screen, infiltration gallery, 18- to 20-inch underground pipe, flume, stream restoration, and dewatering above 9,000 feet, using an accelerated design-and-build CMAR process.

Project Details

Owner Type
Municipal / County
Primary Scope
CMAR · Dewatering · Drainage / Flood Control · Earthwork / Grading · Structural Concrete · Utilities
Ridgway 01 AI ENHANCED UNDER 800KB

About the Project

Meridian is delivering the Beaver Creek Diversion Restoration through CMAR in a high-altitude, environmentally sensitive setting above 9,000 feet. The scope includes boulder grade-control structures, a Coanda screen, infiltration gallery, 18- to 20-inch underground pipe and flume, stream restoration, and dewatering.

The CMAR approach allows Meridian to bring construction input into an accelerated design-and-build process while self-performing 93% of the work, including excavation, earthwork, pipe, dewatering, and cast-in-place and precast concrete structures.

Have a complex project that needs the right team in the field?