Third stage booster 03 rebar tank
Projects

AZ Mining Booster Station

HDPE Pipe Fusing • Mine Pipeline / Large-Diameter HDPE

Meridian self-performed approximately 80% of the project, including excavation, clearing and grubbing, compacted backfill, gravel roadways, riprap, dewatering, stormwater control, and stream diversion. Safety was a priority throughout construction, with strict confined-space procedures and continuous monitoring implemented for work within the U-channel, slurry tank, and fresh water tank.

Project Details

Owner Type
Mining Company
Primary Scope
HDPE Pipe Fusing · Mine Pipeline / Large-Diameter HDPE · Utilities
Delivery Method
80% Self-Performed
Third stage booster 04 lined channel

About the Project

This project included major civil and structural improvements, with approximately 400,000 cubic yards of cut-to-fill earthwork, 12 drilled shafts, 2,500 cubic yards of structural concrete, structural steel, 11,000 linear feet of 54-inch HDPE pipe, large-diameter process piping, and two tanks. The work was completed in a remote, environmentally sensitive area with a strong emphasis on quality control, documentation, and schedule performance.

Have a complex project that needs the right team in the field?