Meridian self-performed 100% of the project, including fabrication and installation of the stainless steel structure and piping systems, with no subcontracted work. The project was completed with an emphasis on safety and environmental sensitivity while delivering the full scope within the established project cost.

Project Details

Owner Type
Mining Company
Primary Scope
Stainless Steel Piping · Utilities
Delivery Method
99% Self-Performed
Ray 4 booster 03 pump platform cropped

About the Project

This project involved the fabrication and installation of a 62-by-45-foot stainless steel structural platform with FRP grating in a mine environment. The work also included installing four 300-horsepower vertical turbine pumps and approximately 80 linear feet of 12-inch stainless steel piping with flow meters, valves, and air release valves.