Booster and Pipe Construction
- Mining and Industrial
- Pima County, AZ
Stainless Steel Piping
Meridian self-performed 100% of the project, including fabrication and installation of the stainless steel structure and piping systems, with no subcontracted work. The project was completed with an emphasis on safety and environmental sensitivity while delivering the full scope within the established project cost.
Project Details
- Owner Type
- Mining Company
- Primary Scope
- Stainless Steel Piping · Utilities
- Delivery Method
- 99% Self-Performed
About the Project
This project involved the fabrication and installation of a 62-by-45-foot stainless steel structural platform with FRP grating in a mine environment. The work also included installing four 300-horsepower vertical turbine pumps and approximately 80 linear feet of 12-inch stainless steel piping with flow meters, valves, and air release valves.
More Work
Related Projects
-
Mining and Industrial
Mine Facility Expansion
-
Pima County, AZ · Mining and Industrial
Booster and Pipe Construction
-
Green Valley, Pima County, AZ · Mining and Industrial
AZ Mining Booster Station
-
Bayard, New Mexico · Mining and Industrial
PLS Pipeline Reroute
-
Lower Greasewood / Ganado, Navajo Nation, Arizona · Mining and Industrial
Lower Greasewood Water System: Industrial Project
-
Chino, NM · Mining and Industrial
Flood Pipeline Reroute
1 – 3 of 6