Owner Type: Mining Company

Booster and Pipe Construction

· pyxl

Projects AZ Booster Pumping Station Home Projects AZ Booster Pumping Station Mining and Industrial Pima County, AZ Stainless Steel Piping Meridian self-performed 100% of the project, including fabrication and installation of the stainless steel structure and piping systems, with no subcontracted work. The project was completed with an emphasis on safety and environmental sensitivity while…

AZ Mining Booster Station

· pyxl

Projects Third Stage Booster Station and Pipeline Construction Home Projects Third Stage Booster Station and Pipeline Construction Mining and Industrial Green Valley, Pima County, AZ HDPE Pipe Fusing • Mine Pipeline / Large-Diameter HDPE Meridian self-performed approximately 80% of the project, including excavation, clearing and grubbing, compacted backfill, gravel roadways, riprap, dewatering, stormwater control, and…

WTP Mechanical, Electrical & Instrumentation Installation

· pyxl

Projects WTP Mechanical, Electrical & Instrumentation Installation Home Projects WTP Mechanical, Electrical & Instrumentation Installation Mining and Industrial Patagonia, Arizona Water Treatment Plant Installation / Mine Infrastructure The project installed a mine-site water treatment plant, including FRP/HDPE tanks, a lime silo, multi-flow unit, filter press, pumps, steel platforms, stairs, and handrails. Work included process piping,…

PLS Pipeline Reroute

· pyxl

Projects PLS Pipeline Reroute Home Projects PLS Pipeline Reroute Mining and Industrial Bayard, New Mexico HDPE Pipe Fusing • Mine Pipeline / Large-Diameter HDPE Work took place around active mine operations in New Mexico, requiring close coordination with the site’s safety and environmental teams throughout the reroute. Meridian handled HDPE installation directly, subcontracting only trucking…

Sleepy Farms Dewatering: Specialty Project

· pyxl

Projects Sleepy Farms Dewatering: Specialty Project Home Projects Sleepy Farms Dewatering: Specialty Project Water / Wastewater New Mexico High Water Table, Regulatory Compliance There are very few contractors that perform dewatering. However, it was our competitive pricing that set us at the forefront of the Sleepy Farms Dewatering project. This case involved a general contractor…

Lower Montoyas Arroyo Water Quality Feature: Flood Control Project

· pyxl

Projects Lower Montoyas Arroyo Water Quality Feature: Flood Control Project Home Projects Lower Montoyas Arroyo Water Quality Feature: Flood Control Project Water / Wastewater Monsoon Conditions, Engineered Flood Control Meridian Engineering secured the Lower Montoyas Arroyo Water Quality feature as a low-priced, qualified bidder. This flood control project called us to address sediment removal and…

67th Street Chlorine Booster Station: Industrial Project

· pyxl

Projects 67th Street Chlorine Booster Station: Industrial Project Home Projects 67th Street Chlorine Booster Station: Industrial Project Water / Wastewater Water Quality Risk, Uninterrupted Service The city of Lawton was facing the potential of a high algae content in their drinking water storage system during periods of high heat. The algae count in the drinking…

Roaring Fork Transportation Authority – Roaring Fork Bridge Rehabilitation

· pyxl

Projects Roaring Fork Transportation Authority – Roaring Fork Bridge Rehabilitation Home Projects Roaring Fork Transportation Authority – Roaring Fork Bridge Rehabilitation DOT / Transportation Carbondale, CO Aging Structure, Full Rehabilitation Meridian was engaged to rehabilitate a five-span, 19th-century bridge for the Roaring Fork Transportation Authority in Carbondale, Colorado. Work included temporary shoring, timber pier replacement,…

Flood Pipeline Reroute

· pyxl

Projects 8-Dam Flood Pipeline Reroute Home Projects 8-Dam Flood Pipeline Reroute Mining and Industrial Chino, NM Complete Mine Pipeline / Large-Diameter HDPE The project involved rerouting approximately 12,600 linear feet of mine pipeline around the Lampbright stockpile. The work included 10,100 linear feet of 30-inch HDPE pipe and 2,500 linear feet of 24-inch welded stainless…