PLS Pipeline Reroute
- Mining and Industrial
- Bayard, New Mexico
HDPE Pipe Fusing • Mine Pipeline / Large-Diameter HDPE
Work took place around active mine operations in New Mexico, requiring close coordination with the site's safety and environmental teams throughout the reroute. Meridian handled HDPE installation directly, subcontracting only trucking and blade work, closing out the project with a satisfactory performance evaluation from the owner.
Project Details
- Owner Type
- Mining Company
- Primary Scope
- HDPE Pipe Fusing · Mine Pipeline / Large-Diameter HDPE · Utilities
- Delivery Method
- 99% Self-Performed
About the Project
Meridian constructed a new PLS Pipeline, installing approximately 10,000 LF of 30-inch HDPE together with roughly 2,000 LF of 24- and 28-inch stainless-steel pipe. The work was performed in an active mine environment where pipeline execution, site safety, and environmental controls all had to remain aligned.
Meridian self-performed 99% of the project, including HDPE installation. The final contract value reflected additional work requested by the owner.
More Work
Related Projects
-
Mining and Industrial
Mine Facility Expansion
-
Pima County, AZ · Mining and Industrial
Booster and Pipe Construction
-
Green Valley, Pima County, AZ · Mining and Industrial
AZ Mining Booster Station
-
Bayard, New Mexico · Mining and Industrial
PLS Pipeline Reroute
-
Lower Greasewood / Ganado, Navajo Nation, Arizona · Mining and Industrial
Lower Greasewood Water System: Industrial Project
-
Chino, NM · Mining and Industrial
Flood Pipeline Reroute
1 – 3 of 6