Projects Russell Gulch Landfill Stage 3A Expansion Home Projects Russell Gulch Landfill Stage 3A Expansion Water / Wastewater Gila County, Arizona Landfill Expansion / Environmental Civil Construction The project expanded the Stage 3A landfill cell and surface impoundment across approximately 6.1 acres, including mass earthwork, subgrade preparation, leachate collection piping, dewatering, and a geosynthetic liner…
Projects Navajo Nation – Fruitland Diversion & Fish Entrainment Weir Project Home Projects Navajo Nation – Fruitland Diversion & Fish Entrainment Weir Project Water / Wastewater San Juan County, New Mexico Diversion / Fish-Entrainment Weir Replacement The project involves replacing the existing Fruitland Canal fish-entrainment weir, control gates, and sluiceway with a new integrated diversion…
Projects Replacement of American Canal Lining Home Projects Replacement of American Canal Lining Federal Civil El Paso County, Texas Canal Rehabilitation / Environmental Remediation Meridian reconstructed 2,600 LF of the American Canal for the IBWC, placing approximately 5,800 CY of structural concrete and 1.03 million pounds of reinforcing steel while removing 17,000 CY of contaminated…
Projects Alamo Highway Road Project – Navajo Nation Home Projects Alamo Highway Road Project – Navajo Nation Federal Civil Cibola County, New Mexico Rock Blasting • Remote Roadway Construction Meridian installed a new PLS pipeline around the Lampbright stockpile, combining approximately 10,000 LF of 30-inch HDPE with roughly 2,000 LF of 24- and 28-inch stainless…
Projects Colorado DOT – SH 133 Rockfall Mitigation: Specialty Project Home Projects Colorado DOT – SH 133 Rockfall Mitigation: Specialty Project DOT / Transportation Pitkin County, Colorado High-Risk Corridor, Engineered Rockfall Solution State highway 133 from Milepost 47 through Redstone, CO to Milepost 59 is a high-volume stretch of highway located in an environmentally sensitive…
Projects Sleepy Farms Dewatering: Specialty Project Home Projects Sleepy Farms Dewatering: Specialty Project Water / Wastewater New Mexico High Water Table, Regulatory Compliance There are very few contractors that perform dewatering. However, it was our competitive pricing that set us at the forefront of the Sleepy Farms Dewatering project. This case involved a general contractor…
Projects Lower Montoyas Arroyo Water Quality Feature: Flood Control Project Home Projects Lower Montoyas Arroyo Water Quality Feature: Flood Control Project Water / Wastewater Monsoon Conditions, Engineered Flood Control Meridian Engineering secured the Lower Montoyas Arroyo Water Quality feature as a low-priced, qualified bidder. This flood control project called us to address sediment removal and…
Projects 67th Street Chlorine Booster Station: Industrial Project Home Projects 67th Street Chlorine Booster Station: Industrial Project Water / Wastewater Water Quality Risk, Uninterrupted Service The city of Lawton was facing the potential of a high algae content in their drinking water storage system during periods of high heat. The algae count in the drinking…
Projects Colorado DOT-US 160 Scour Measure Home Projects Colorado DOT-US 160 Scour Measure DOT / Transportation Montezuma County, CO Environmental Deadline, On-Time Delivery This project was located in CDOT’s Region 5 in Montezuma County. Project consisted of US 160 Scour Repairs at the San Juan River and Aztec Creek over 1½ acres. The work performed…