WTP Mechanical 01 ENHANCED UNDER 800KB
Projects

WTP Mechanical, Electrical & Instrumentation Installation

Water Treatment Plant Installation / Mine Infrastructure

The project installed a mine-site water treatment plant, including FRP/HDPE tanks, a lime silo, multi-flow unit, filter press, pumps, steel platforms, stairs, and handrails. Work included process piping, electrical and instrumentation connections, and commissioning support, all delivered under an accelerated schedule.

Project Details

Owner Type
Mining Company
Primary Scope
Process Piping · Utilities · Water Treatment / Mechanical
WTP Mechanical 02 ENHANCED UNDER 800KB

About the Project

Meridian installed the major mechanical components required to bring a mine-site water-treatment plant into operation, including FRP/HDPE tanks, a lime silo, multi-flow unit, filter press, pumps, steel platforms, stairs, and handrails. The team also connected process piping, electrical systems, and instrumentation between the components and supported startup and commissioning.

The work was delivered under an accelerated schedule that required extended shifts and seven-day workweeks. Meridian self-performed the process-piping and steel-platform installation scopes, maintaining direct control over critical field execution.