Tramway Boulevard (NM 556) Bridge Rehabilitation
- DOT / Transportation
- Bernalillo County, New Mexico
Bridge Rehabilitation / Structural Steel
The project rehabilitated a prefabricated pedestrian steel-truss bridge for NMDOT, including removals, structural steel, bridge deck panels, concrete, epoxy overlay, riprap, recoating, guardrail, and traffic-control work.
Project Details
- Owner Type
- State DOT
- Primary Scope
- Bridge Rehabilitation · Structural Concrete · Structural Steel
About the Project
Meridian rehabilitated a prefabricated pedestrian steel-truss bridge along Tramway Boulevard for NMDOT. The project combined structure removals, structural steel work, bridge deck panels, concrete, epoxy overlay, riprap, recoating, guardrail, signing, and traffic-control improvements.
Meridian self-performed the concrete, removals, bridge deck panels, structural steel, epoxy overlay, and riprap scopes, keeping the primary rehabilitation work under direct field control while coordinating specialized coatings and roadway support.
More Work
Related Projects
-
Mining and Industrial
Mine Facility Expansion
-
Pima County, AZ · Mining and Industrial
Booster and Pipe Construction
-
Green Valley, Pima County, AZ · Mining and Industrial
AZ Mining Booster Station
-
Patagonia, Arizona · Fabrication
WTP Mechanical, Electrical & Instrumentation Installation
-
Tohono O’odham Nation, Arizona · Federal Civil
High-Water Crossing at Vamori Wash
-
Bernalillo County, New Mexico · DOT / Transportation
Tramway Boulevard (NM 556) Bridge Rehabilitation
1 – 3 of 6
