Beaver Creek Diversion Restoration – CMAR
- Alternative Delivery
- Ridgway, Colorado
CMAR / High-Altitude Stream Restoration
The project delivers boulder grade-control structures, a Coanda screen, infiltration gallery, 18- to 20-inch underground pipe, flume, stream restoration, and dewatering above 9,000 feet, using an accelerated design-and-build CMAR process.
Project Details
- Owner Type
- Municipal / County
- Primary Scope
- CMAR · Dewatering · Drainage / Flood Control · Earthwork / Grading · Structural Concrete · Utilities
About the Project
Meridian is delivering the Beaver Creek Diversion Restoration through CMAR in a high-altitude, environmentally sensitive setting above 9,000 feet. The scope includes boulder grade-control structures, a Coanda screen, infiltration gallery, 18- to 20-inch underground pipe and flume, stream restoration, and dewatering.
The CMAR approach allows Meridian to bring construction input into an accelerated design-and-build process while self-performing 93% of the work, including excavation, earthwork, pipe, dewatering, and cast-in-place and precast concrete structures.
More Work
Related Projects
-
Mining and Industrial
Mine Facility Expansion
-
Pima County, AZ · Mining and Industrial
Booster and Pipe Construction
-
Green Valley, Pima County, AZ · Mining and Industrial
AZ Mining Booster Station
-
Patagonia, Arizona · Fabrication
WTP Mechanical, Electrical & Instrumentation Installation
-
Tohono O’odham Nation, Arizona · Federal Civil
High-Water Crossing at Vamori Wash
-
Bernalillo County, New Mexico · DOT / Transportation
Tramway Boulevard (NM 556) Bridge Rehabilitation
1 – 3 of 6