Florence Canal Image 03 AI ENHANCED UNDER 800KB
Projects

Florence Canal Reach II Rehabilitation

Canal Rehabilitation / Irrigation Infrastructure

The project rehabilitated approximately 11.5 miles of canal for the San Carlos Irrigation and Drainage District, including structures, concrete pipe, and related appurtenances, with 98% of the work self-performed.

Project Details

Owner Type
Utility / Authority
Primary Scope
Canal Rehabilitation · Earthwork / Grading · Structural Concrete · Utilities
Florence Canal Image 01 AI ENHANCED UNDER 800KB

About the Project

Meridian rehabilitated approximately 11.5 miles of the Florence Canal Reach II system, delivering excavation, concrete-lined canal, concrete structures, pipe work, and related appurtenances across an existing irrigation corridor. The work had to integrate with existing flow-control structures, turnouts, road crossings, wells, utilities, and other operating features.

Meridian self-performed 98% of the project, including excavation, concrete structures, pipe work, and canal construction, providing direct control over the critical field scopes.

Have a complex project that needs the right team in the field?