Florence Canal Reach II Rehabilitation
- Water / Wastewater
- Pinal County, Arizona
Canal Rehabilitation / Irrigation Infrastructure
The project rehabilitated approximately 11.5 miles of canal for the San Carlos Irrigation and Drainage District, including structures, concrete pipe, and related appurtenances, with 98% of the work self-performed.
Project Details
- Owner Type
- Utility / Authority
- Primary Scope
- Canal Rehabilitation · Earthwork / Grading · Structural Concrete · Utilities
About the Project
Meridian rehabilitated approximately 11.5 miles of the Florence Canal Reach II system, delivering excavation, concrete-lined canal, concrete structures, pipe work, and related appurtenances across an existing irrigation corridor. The work had to integrate with existing flow-control structures, turnouts, road crossings, wells, utilities, and other operating features.
Meridian self-performed 98% of the project, including excavation, concrete structures, pipe work, and canal construction, providing direct control over the critical field scopes.
More Work
Related Projects
-
Mining and Industrial
Mine Facility Expansion
-
Pima County, AZ · Mining and Industrial
Booster and Pipe Construction
-
Green Valley, Pima County, AZ · Mining and Industrial
AZ Mining Booster Station
-
Patagonia, Arizona · Fabrication
WTP Mechanical, Electrical & Instrumentation Installation
-
Tohono O’odham Nation, Arizona · Federal Civil
High-Water Crossing at Vamori Wash
-
Bernalillo County, New Mexico · DOT / Transportation
Tramway Boulevard (NM 556) Bridge Rehabilitation
1 – 3 of 6
