The project involved rerouting approximately 12,600 linear feet of mine pipeline around the Lampbright stockpile. The work included 10,100 linear feet of 30-inch HDPE pipe and 2,500 linear feet of 24-inch welded stainless steel pipe, with 99% of the project self-performed.

Project Details

Owner Type
Mining Company
Primary Scope
HDPE Pipe Fusing · Mine Pipeline / Large-Diameter HDPE · Utilities
Delivery Method
Self-Performed
Dam Flood Pipeline 03 ENHANCED UNDER 800KB

About the Project

The new pipeline was approximately 12,600’ in length (2,500 LF of 24” welded SS pipe & 10,100 LF of 30” HDPE) and was located along the east and north side of Lampbright stockpile. The pipeline was tied to the existing line, valve tee,just north of the Chino, NM, Plant.