The project involved rerouting approximately 12,600 linear feet of mine pipeline around the Lampbright stockpile. The work included 10,100 linear feet of 30-inch HDPE pipe and 2,500 linear feet of 24-inch welded stainless steel pipe, with 99% of the project self-performed.
Project Details
- Owner Type
- Mining Company
- Primary Scope
- HDPE Pipe Fusing · Mine Pipeline / Large-Diameter HDPE · Utilities
- Delivery Method
- Self-Performed
About the Project
The new pipeline was approximately 12,600’ in length (2,500 LF of 24” welded SS pipe & 10,100 LF of 30” HDPE) and was located along the east and north side of Lampbright stockpile. The pipeline was tied to the existing line, valve tee,just north of the Chino, NM, Plant.
More Work
Related Projects
-
Mining and Industrial
Mine Facility Expansion
-
Pima County, AZ · Mining and Industrial
Booster and Pipe Construction
-
Green Valley, Pima County, AZ · Mining and Industrial
AZ Mining Booster Station
-
Bayard, New Mexico · Mining and Industrial
PLS Pipeline Reroute
-
Lower Greasewood / Ganado, Navajo Nation, Arizona · Mining and Industrial
Lower Greasewood Water System: Industrial Project
-
Chino, NM · Mining and Industrial
Flood Pipeline Reroute
1 – 3 of 6