Our strong past performance and standing as a low competitive bidder and qualified contractor with appropriate licensing, insurance, and bonding abilities led us to the Lower Greasewood Water System. This critical industrial project required innovative solutions to obtain reliable, treated water in a remote setting.
Despite out of sequence work requests and time-consuming supply chain hassles due to COVID-19, Meridian Engineering was successful in completing the project per plans and specifications. We worked diligently to upgrade the waterline system with approximately 20,000 LF of waterline improvements and the implementation of a new water treatment facility, fully stacked with the proper filtering equipment and two precast well house buildings to sufficiently serve reliable water to the local area.